The provided industrial water chiller machine is 4 ton refrigerating capacity, 5 HP total power of compressors, air-cooled typpe, tube-in-shell type or spiral type of evaporator, R22/R407C refrigerant used as standard for efficient cooling. Optional for three phase four wire 240V/60Hz, 380V/50Hz, 480V/60Hz power supply.
Features
Adopted high quality compressors and pumps to ensure safe & quiet running, power saving and durable service life.
Employed microcomputer with easy operation which can control temperature within 3℃ to 45℃ precisely.
Unique design for condenser and heat-dispersion unit result in excellent heat-exchange effect.
Equiped with electrical current overload protection, high & low pressure switch, electrical timer delay safety device. It will alarm to display faulty while any malfunction occurs.
Built in stainless steel insulated water tank, durable and easy to clean.
Complete safely devices including power reverse phase, power short phase and anti-freeze protection.
Ultra low temperature type of chiller can reach below -60℃.
Parameter List
Model
ATO-LC5A
Cooling Capacity
4 ton
Number of Compressors
1
Compressor Total Power
5 HP
Refrigerant
R22 / R407C (Optional)
Evaporator Type
Spiral type / Tube-in-shell type (Optional)
Condenser Type
Finned
Number of Fan
2
Single Fan power
0.18kW
Number of Cooling Water Inlet/Outlet
1 group
Cooling Water Inlet/Outlet Size
DN25
Water Tank Capacity
67L
Pump Power
0.5HP
Pump Flow
100L/min
Pump Lifts
22M
Power Supply
3-phase 4-wire AC 208V/60Hz, 220V/60Hz, 240V/60Hz, 380V/50Hz, 400V/50Hz, 415V/50Hz, 480V/60Hz (Optional)
Control Voltage
1-phase AC 220V (L+N)
Total Power
4.5kW
Wires Specifications
4x4mm2
Certification
CE
Dimension
L*W*H=1250*630*1240mm
Net Weight / Gross Weight
170kg / 210kg
Shipping Way of ATO Water Chiller
Just confirm us the shipping way by email when place your order.
1. Ship by Air: The compressed refrigerant inside the chiller is a dangerous item with the possibility of explosion, so it needs to release the compressed refrigerant before transportation. (It means that water chiller without refrigerant when choosing this shiping way. After the machine arrives at your destination, you need to add refrigerant by local professionals, the process is as simple as adding refrigerant for ordinary air conditioners.) Delivery time is about 15-30 days.
2. Ship by Sea: The transportation time is longer (about 40-55 days), and there is no need to add refrigerant after the equipment arrives at the destination.
Note:
1. The “cooling capacity” is tested based on: Inlet and outlet water temperature of freezing is 12℃/7℃, and the inlet and outlet water temperature of cooling is 30℃/35℃.
2. Working temperature range: Chilled water temperature range is 5℃-35℃, inlet and outlet water temperature difference is 3℃-8℃, condensation temperature not higher than 35℃.
3. Conversion of units: 1 ton cooling capacity=3024kcal/hr, 1kcal/hr=3.969BTU/hr, 1HP=0.735kW=2580kcal/hr
Water Chiller Structure Diagram
①
Compressor
②
High pressure gauge
③
Condenser
④
Dry filter
⑤
Expansion valve
⑥
Water supply
⑦
Evaporator
⑧
Low pressure gauge
⑨
Water tank
⑩
Drain
⑪
Refrigerated water
⑫
Pump
3 tips for startup of newly purchased water chiller
The following items must be checked before the first operation:
1. Check whether the power supply voltage and phase number meet the model and specification, please refer to the nameplate. (Note: the power supply of ATO air-cooled water chiller above 3HP is 3-phase 4-wire, voltage is 220V ~ 480V / 50Hz or 60Hz, power phase lines are R, S and T respectively, the neutral line is N, and the grounding wire is two-color wire, represented by E. When the light is not on or the red light is on and the fault code and alarm number are displayed during the first start-up, any two phases of the phase line can be exchanged, and the switch can be closed after the connection.)
2. Check whether the chilled water pipe and cooling circulating water pipe are connected to the pipeline and keep the valve open.
3. Fill the freezing water tank with water or other freezing medium before starting the water pump. (please use refrigerant as required).